Highway viaduct in Chaudfontaine

    Highway viaduct in Chaudfontaine

    This viaduct 1 600 m long allows the A605 motorway connection between the motorways E40 Brussels-Aachen and E25 Liège-Luxembourg to cross at 80 m height the valley of the Vesdre.

    Particularly wide, 31,7 m, to accomodate two times three traffic lanes and a cycle track, the structure consists of a box girder 7 m high with lateral braces. The bridge with spans of 140 m should be built by launching.

    Up to the tender phase, two solutions remain in competition, one composite steel-concrete with 18 000 tons of steel and 25 000 m³ of concrete, the other of prestressed concrete with 50 000 m³ of concrete and 3 500 tons of prestressing.

    Mission

    Mission: concept and final design including dynamic calculation under turbulent wind, tender document. Safety coordination projet

    • 2 photos
    • Location

    Feel free to reach us

    Contact us